The elements produced are first laid dry before being packed. This is essential to make sure that all the production stages have been carried out properly.
A mock building site is created highlighting all the related installation problems that might arise. This operation will facilitate the next phases of the project, thus eliminating the risk that the material reaching the building site might be of the wrong size or not meet the requirements of the executive drawing.